United Power Plant Development Project
Construction of Passenger Ship Landing Station with Steel Causeway and Gangway and Pontoon in Patenga Terminal
Construction of Passenger Ship Landing Station with Steel Causeway, Gangway and Pontoon for the purpose of Passenger Jetty at Sadarghat.
Eviction Works in Laldiar Char
6 storied Composite industrial building at Section Seven Ltd. At CEPZ
Dredging for Changjiang Yichang Waterway Engineering Bureau (CYWEB) at Coxs Bazaar Airport
Steelwork for roof frame including roofing over the gallery of CPA, the high-tech swimming pool
Construction of Precast Parapet Erection & Cable Trough Cast in Situ (For Dhaka Metro)
Construction of Pile Cap and Pier Head in Dhaka Mass Rapid Transit Development (For Dhaka Metro)
- 1
- 2